# Why architect utilisation reports show different percentages
Source: https://korrel.ai/blog/reconcile-architect-utilisation-report-percentages
Published: 2026-11-26
Updated: 2026-11-26
Topic: architect utilisation reports
Tags: time-tracking, cost-tracking
---
## Why do architect utilisation reports differ?

Architect utilisation reports can show different percentages because they count different work, use different denominators, or measure wages instead of hours. The numerator is the amount being divided. The denominator is the amount you divide it by.

When comparing architect utilisation reports, check those definitions before changing a target. A percentage alone does not tell you which calculation produced it. Nor does a higher figure prove that a practice earned more profit.

Start with the question each report answers. How much of paid wage cost went to projects? How much paid time went to projects? How much available working time was marked billable? These are separate questions.

Allocating project time to design stages is another question. The guide to [tracking time against RIBA stage fees](/blog/track-time-against-riba-stage-fees) explains that allocation. It does not establish a denominator for team utilisation.

The example below uses the same records throughout. Only the report definitions change.

## Keep one complete weekly record

This is an invented example, not a practice survey or a recommended staffing pattern. It contains a senior and a part-time colleague. Both record all paid hours for the same week. There is no overtime.

The example uses wage rates per paid hour. They are not billing rates or market benchmarks. They exclude employer contributions and other costs added to wages.

| Weekly record | Senior | Part-time colleague | Team |
|---|---:|---:|---:|
| Paid recorded hours | 40 | 24 | 64 |
| Direct project hours | 20 | 18 | 38 |
| Of which marked billable | 15 | 18 | 33 |
| Of which marked non-billable | 5 | 0 | 5 |
| Non-project hours | 12 | 6 | 18 |
| Paid leave hours | 8 | 0 | 8 |
| Available hours after leave | 32 | 24 | 56 |
| Wage per paid hour | £60 | £30 | Not applicable |

The billable and non-billable rows are parts of direct project time. Do not add them to direct project hours again.

Check the complete record first: 38 project hours + 18 non-project hours + 8 leave hours = 64 paid recorded hours. Available hours are 64 − 8 = 56. Here, available hours include non-project working time.

Do not assign a full-time week to the part-time colleague. Use the recorded 24 paid hours. Also keep leave separate from non-project duties. A missing time entry is neither leave nor evidence that someone had no project work.

## Calculate the wage-cost ratio separately

The [AIA guidance on budgeting key performance indicators](https://www.aia.org/sites/default/files/2025-12/AIA_BestPractices_Budgetingkeyperformanceindicators.pdf) calculates utilisation as direct labour divided by total labour. Its definitions use wages. Direct labour includes wages for client project hours, regardless of whether those hours are billed.

Apply that wage basis to the invented records:

| Wage calculation | Senior | Part-time colleague | Team |
|---|---:|---:|---:|
| Direct project wages | 20 × £60 = £1200 | 18 × £30 = £540 | £1740 |
| Non-project wages | 12 × £60 = £720 | 6 × £30 = £180 | £900 |
| Paid leave wages | 8 × £60 = £480 | £0 | £480 |
| Total wages | 40 × £60 = £2400 | 24 × £30 = £720 | £3120 |

The check is £1740 + £900 + £480 = £3120. For this example, paid leave stays in total wages.

**AIA labour-cost ratio on this wage basis = £1740 ÷ £3120 × 100 = 55.77%.**

The senior's non-billable project time still adds £300 to direct project wages: 5 × £60. Removing it would change the work classification, not correct the arithmetic.

This ratio weights hours by each person's wage rate. The senior has the higher wage rate and the lower share of paid hours on projects. That combination makes the wage-cost ratio lower than the project-hours ratio below.

Keep the cost definition explicit. The [RAIC financial management chapter](https://chop.raic.ca/en/chapter-3.4) defines direct personnel expense to include salary, contributions and employee benefits. That is not this wage-only basis. The chapter also discusses utilisation factors in hours. Do not combine its cost definition with the AIA wage calculation without a separate reconciliation.

## Calculate the two hours ratios without mixing them

First, keep all direct project work in the numerator. Keep all paid recorded time in the denominator, including leave.

**Direct project share of paid recorded hours = 38 ÷ 64 × 100 = 59.38%.**

This calculation gives each recorded hour equal weight. Wages do not enter it. The gap from the wage-cost result is not an error or a rounding difference. It comes from weighting the same work differently.

Next, use only time marked billable. Divide it by available hours after leave.

**Billable share of available hours = 33 ÷ 56 × 100 = 58.93%.**

This last calculation changes both parts of the fraction. It removes five non-billable project hours from the numerator. It removes eight paid leave hours from the denominator. The 18 non-project working hours stay in the denominator.

The result is slightly lower than the project share of paid hours. Excluding leave did not make it higher because the numerator changed too. Calling the difference a leave adjustment would hide half the explanation.

These are three distinct ratios, not three interchangeable versions of one measure:

| Report label | Unit in the fraction | Numerator | Denominator | Result |
|---|---|---:|---:|---:|
| Direct project wage share | Pounds | £1740 | £3120 | 55.77% |
| Direct project share of paid time | Hours | 38 | 64 | 59.38% |
| Billable share of available time | Hours | 33 | 56 | 58.93% |

Keep full precision during calculation. Round only the displayed result. None of these percentages is a target or an external benchmark.

## Save a report-definition record

Use the following record beside each report. It is a reusable manual check, not a template prescribed by either professional source.

| Field | What to record |
|---|---|
| Unit | Hours or wages; identify any costs added to wages |
| Numerator | Exact categories included in the amount being measured |
| Denominator | Exact categories included in the total |
| Period | Start date, end date and date of the export |
| Included people | Named team or staff group, with explicit exclusions |
| Work classification | Rules for project, non-project and billable status |
| Absence treatment | Which paid and unpaid absences enter each total |

Give each definition a name and an owner. For this example, the period and included people stay identical across the three reports. The unit and category rules do not.

Attach the totals used in each calculation. A displayed percentage cannot show wage rates, the amount of leave, or the split between billable and non-billable project work. You cannot convert between these ratios from one percentage alone.

Check the export date as well as the reporting week. Late entries can change the records after someone saves a report. Use the same record set before investigating a formula difference.

## Resolve differences before changing a target

Compare the report-definition records field by field. Then rebuild each total from the same rows. Assign an owner to investigate any unexplained difference. Do not change time classifications to make the reports match.

Keep non-billable project work attached to its project. The guide to [recording internal rework time](/blog/record-internal-rework-time-agency-project) shows why correction effort must remain visible even when it creates no extra charge. Investigate that work separately from non-project duties.

Do not rank individuals from this comparison. The example shows differences between report definitions, not differences in staff performance. It also contains no project fees or complete practice costs. It cannot establish profit.

If you change a definition, recalculate the comparison period under the new rules. Record the change beside the trend. Otherwise, a reporting change can look like a change in delivery. Keep the old definition available for anyone reviewing earlier figures.

The [time-tracking guides](/blog/topics/time-tracking) cover related recording decisions. This reconciliation remains a manual task. Do not assume a time-tracking dashboard includes paid leave or uses a payroll wage basis.

For project time and cost records, [create a Korrel account](https://app.korrel.ai/signup). Keep your report-definition record beside the review.
