# How to price optional deliverables in an implementation proposal
Source: https://korrel.ai/blog/price-optional-deliverables-implementation-proposal
Published: 2026-11-26
Updated: 2026-11-26
Topic: optional deliverables
Tags: estimating, proposals
---
## Price the combination, not just the options

Optional deliverables are outputs a client can select without removing the mandatory scope. Price each valid combination from the work it needs. Then calculate its client price.

Do not assume two standalone option prices will add up correctly. They can contain the same connector twice. They can also omit integration needed only when both options run together.

This guide uses a manual matrix for an implementation proposal with two optional deliverables. It separates mandatory work, option-specific work, shared work and combination-only work. You can use it in a spreadsheet before you prepare the client proposal.

First, check that the base scope works without either option. Use these [questions before quoting a fixed price implementation project](/blog/questions-before-fixed-price-quote) to test missing requirements. A selection matrix cannot resolve an unknown interface or an untested assumption.

## What do your optional deliverables require?

Give every option a named output and a clear test for completion. Record the client inputs it needs. Identify any other option it requires.

For this invented example, the base delivers a configured service with mandatory environment setup. Option A adds a customer data import. Option B adds a management report.

Either option needs the same connector to an existing data service. A connector is the software that lets the implementation exchange data with that service. Both options can use one connector here.

Selecting both options adds a separate integration task. The team must make the imported records work with the report and test that combined flow. Neither standalone option needs that task.

These assumptions apply to this example, not all implementations. A different design could require separate connectors or more combined testing. Ask the technical lead to confirm which work each option needs before you price it.

There is a useful warning in [OpenCraft's estimating method](https://handbook.opencraft.com/en/latest/how_to_do_estimates/). Step 12 distributes supporting work across features because clients choose subsets. This is one practitioner's approach. OpenCraft explicitly rejects fixed-price and fixed-scope arrangements for large projects. Its guidance is not an endorsement of fixed-price implementation work.

The lesson used here is narrower: every selection needs its supporting work. Do not copy its buffer percentages into this calculation.

## Build the cost matrix before the client prices

The following amounts are explicitly invented. They form the complete listed cost base for this example. All amounts are in pounds, before tax. They are not supplier quotes, market rates or benchmarks.

| Cost component | Base only | Base plus A | Base plus B | Base plus both |
|---|---:|---:|---:|---:|
| Base delivery | £2,400 | £2,400 | £2,400 | £2,400 |
| Mandatory setup | £600 | £600 | £600 | £600 |
| A-only work | £0 | £900 | £0 | £900 |
| B-only work | £0 | £0 | £600 | £600 |
| Connector for either or both options | £0 | £300 | £300 | £300 |
| Integration only when both are selected | £0 | £0 | £0 | £150 |
| Total listed cost | £3,000 | £4,200 | £3,900 | £4,950 |

The base cost is £2,400 plus £600, or £3,000. Adding A requires £900 of A-only work and the £300 connector. That makes £4,200.

Adding B instead requires £600 of B-only work and the same £300 connector. That makes £3,900. Selecting both costs £3,000 + £900 + £600 + £300 + £150 = £4,950.

The connector appears once in each relevant column. The combined integration appears only in the final column. Mandatory setup stays in every column, even when the client rejects both options.

The [government's cost estimating guidance](https://www.gov.uk/government/publications/cost-estimating-guidance/cost-estimating-guidance) concerns capital costs for major infrastructure projects and programmes. Section 7.4 calls for separate estimates when design alternatives produce material differences. Section 7.5 calls for a clear breakdown, evidence, assumptions and exclusions. This small implementation matrix is our adaptation of those principles, not a government template.

For a real proposal, add the costs and allowances your business needs. Keep their basis visible. Our guide to [including subcontractor costs in a fixed price quote](/blog/include-subcontractor-costs-fixed-price-quote) explains how cost allowances differ from client price.

## Convert each cost total into a client price

This example uses an invented margin of 25% on the listed cost base. It is an arithmetic assumption, not a pricing recommendation or an industry benchmark.

Here, margin means client price minus listed cost, divided by client price. Calculate client price as listed cost divided by 0.75. Do not multiply cost by 1.25. That would apply a markup, which uses cost as its denominator.

| Selection | Listed cost | Client price | Price less listed cost |
|---|---:|---:|---:|
| Base only | £3,000 | £4,000 | £1,000 |
| Base plus A | £4,200 | £5,600 | £1,400 |
| Base plus B | £3,900 | £5,200 | £1,300 |
| Base plus both | £4,950 | £6,600 | £1,650 |

Each price follows the same calculation. For example, £4,950 divided by 0.75 gives £6,600. The difference is £1,650, which is 25% of £6,600.

This difference is not accounting net profit. It covers only the stated cost basis. It does not show that you have included every business expense.

Now test the standalone increments. A adds £1,600 to the base client price. B adds £1,200. Adding both increments to £4,000 gives £6,800, not £6,600.

That calculation includes the connector twice and omits the combination-only integration. At cost level, remove the extra £300 connector and add £150 of integration. The net correction is £150 of cost, or £200 of client price under this illustrative margin calculation.

The £200 difference is not an unexplained package discount. It follows from different work.

## What changes when the client drops an option?

If the client drops B before work starts, move from the combined column to base plus A. Do not subtract B's standalone increment.

The revised scope no longer needs £600 of B-only work. It also no longer needs £150 of combined integration. Cost falls by £750, from £4,950 to £4,200.

The £300 connector stays. A still needs it. Mandatory setup stays too.

Under the same illustrative margin calculation, client price falls by £1,000, from £6,600 to £5,600. Subtracting B's £1,200 standalone increment would instead leave £5,400. That would not match the retained work and stated pricing basis.

Use this calculation only for the example's scope before work starts. After work begins, check what you have already done or committed to. Removing a future output does not prove that you can avoid all its costs. Review any agreed commercial adjustment separately.

## Show the client complete choices

Present each valid selection with its total price. Name the included outputs beside it. Do not imply that the client can always add or subtract standalone increments.

Keep a dated internal record for each selection:

- Included mandatory and optional deliverables and their completion tests.
- Required client inputs and technical assumptions.
- Mandatory, option-specific, shared and combination-only cost components.
- Listed cost total and client price basis.
- Delivery dates for that selection.
- Reviewer and approved estimate version.

Mark an invalid combination as unavailable. For example, if B needs A in your actual design, do not offer base plus B. Explain why B needs A instead of hiding that requirement in a price note.

Check dates separately from cost. Sharing a connector does not prove that both outputs fit the standalone delivery date. Keep your [estimating methods](/blog/topics/estimating) tied to the work each selection actually requires.

## Keep the matrix separate from product controls

Korrel supports included and excluded deliverables and estimate components. It also stores cost and sell rates separately. Those features can hold the selected scope and its estimate.

The combination matrix described here remains a manual method. It is not a native Korrel option configurator. Do not assume the product will enforce option dependencies, optimise packages or let clients select combinations.

Before you record the selected estimate, compare it with the approved matrix column. Check that the connector appears once. Check that combined integration appears only when both options remain. Ask the technical reviewer to confirm the work. Ask the commercial reviewer to confirm the price.

To record the selected deliverables and their estimate, [sign up for Korrel](https://app.korrel.ai/signup). Keep the manual matrix beside your pricing review.