# Compare client profitability when consulting projects are unfinished
Source: https://korrel.ai/blog/compare-client-profitability-unfinished-projects
Published: 2026-11-25
Updated: 2026-11-24
Topic: compare client profitability
Tags: margin-and-profitability, cost-tracking
---
## How do you compare client profitability fairly?

To compare client profitability, separate completed results, quoted value less cost to date, and forecasts for the full project life. Keep unfinished projects visible. Do not treat their remaining work as free.

A large fee beside a small cost looks attractive. But the fee covers the whole engagement, while the cost covers only the work delivered so far.

Use a different view for each decision:

- Completed results show the outcome of finished delivery.
- Quoted value less cost to date shows recorded cost against the full quoted fee.
- Full-life forecasts include the estimated cost of all remaining delivery.

These are management comparisons, not accounting or legal advice. None establishes recognised revenue or cash profit. They do not establish the right to charge a client either.

For this comparison, define delivery surplus as the fee less the delivery costs included in your review. Define delivery margin as that surplus divided by the fee. State any excluded costs beside the result.

## Fix the boundary before you add the figures

Choose one review date. Use the same currency throughout. Exclude tax. Select a clear project group, such as consulting engagements started during the same year.

When you compare client profitability across that group, keep the project count and status beside each total. A client with one recent start has less completed evidence than a client with several finished engagements. Keep paused work in a separate status rather than treating it as completed. Record any missing timesheets or supplier costs before you calculate a ranking. If you cannot close those gaps yet, mark the affected client result as provisional and name the person who must check it.

Record each project's status separately. Do not infer completion from a final invoice or a nearly exhausted budget. Confirm that the planned delivery is finished and the cost record is complete.

Use one cost policy across both clients. Include recorded labour at internal cost rates. Add subcontractors and project expenses. Keep non-billable delivery time in the cost base, because billable status does not remove the cost of doing work.

Identify client support that sits outside individual projects. Include it once under a stated rule, or disclose its exclusion. Apply the same rule to both clients. Do not allocate shared overhead twice.

The [completed architectural project profit calculation](/blog/calculate-architectural-project-profit) explains how to reconcile a finished job and handle overhead. Here, the main problem is different: clients have unequal amounts of unfinished work.

Keep the accounting boundary separate too. The [IFRS Foundation's IFRS 15 overview](https://www.ifrs.org/issued-standards/list-of-standards/ifrs-15-revenue-from-contracts-with-customers/) links revenue recognition to satisfied performance obligations. These can be satisfied over time or at a point in time. That does not make a full quoted fee recognised revenue today.

## An invented comparison that reverses the ranking

The example below is invented, including the client names and every project figure. It illustrates the calculation, not a benchmark or a Korrel customer result.

At the review date, Alder and Birch each have one completed engagement and one active engagement. Alder's active project has only finished discovery. Birch's active project has reached final validation.

The example includes all delivery labour as well as subcontractors and project expenses. Tax is excluded. Shared overhead and sales costs are also excluded. There are no separate account-support costs in this invented case.

| Client and project | Status | Fee | Cost to date | Estimated remaining cost |
|---|---|---:|---:|---:|
| Alder strategy review | Completed | £20,000 | £14,000 | £0 |
| Alder operating model | Active: discovery finished | £80,000 | £6,000 | £64,000 |
| Birch process review | Completed | £60,000 | £36,000 | £0 |
| Birch rollout support | Active: final validation | £40,000 | £20,000 | £8,000 |

The remaining costs are fresh estimates for named tasks, not unspent portions of the original budget. Both active fees are agreed amounts. No pending fee increases enter the calculation.

Start with the completed engagements alone. Alder has a £6,000 delivery surplus on £20,000 of fees: 30%. Birch has a £24,000 surplus on £60,000: 40%.

Birch has the better completed result in both pounds and percentage terms, but each client has only one completed project here. You cannot use that result alone to label either client consistently good or bad.

## Why quoted value less cost to date puts Alder first

Now combine completed and active work without adding remaining costs. Sum fees and costs for each client before you calculate the percentage.

| Client | Total fees | Total cost to date | Quoted value less cost to date | Percentage of fees |
|---|---:|---:|---:|---:|
| Alder | £100,000 | £20,000 | £80,000 | 80% |
| Birch | £100,000 | £56,000 | £44,000 | 44% |

Alder now appears far stronger. Although the arithmetic is correct, you would misread the figures if you called this the final delivery result.

Alder's £80,000 difference still has to cover £64,000 of estimated remaining work. Birch's £44,000 difference has only £8,000 of estimated remaining work to cover. Delivery status explains the apparent advantage.

Label this view explicitly: full quoted fees less recorded delivery costs to date. Use it to inspect the fee and cost records. Do not use it alone to decide which client deserves the next available team.

Do not average project percentages either. In this invented example, Alder's completed margin is 30%. Its active quoted-value percentage is 92.5%. Adding those percentages and dividing by two gives 61.25%, not the 80% client figure above.

The projects have unequal fees, but a simple average gives them equal weight. To calculate the client figure, divide the summed difference by summed fees instead.

## Add remaining work to compare the full-life forecast

For each project, add cost to date to estimated remaining cost. Subtract that full-life cost from the fee. Then sum the project figures for each client.

| Client | Total fees | Full-life delivery cost | Forecast delivery surplus | Forecast delivery margin |
|---|---:|---:|---:|---:|
| Alder | £100,000 | £84,000 | £16,000 | 16% |
| Birch | £100,000 | £64,000 | £36,000 | 36% |

The ranking reverses. Alder led the quoted-value view by £36,000, but Birch leads the full-life forecast by £20,000. Neither fee changed: the forecast simply includes the unfinished delivery.

Completed results remain actual delivery results under the stated cost policy, while active results remain estimates. Label their combination as a full-life forecast, not a completed result.

Ask the project lead to cost the remaining tasks using current hours and role costs. Include supplier commitments. Account for internal reviews and known corrections too. Do not assume that spending half the budget means finishing half the work.

Our guide to [forecasting fixed fee implementation margin](/blog/forecast-margin-fixed-fee-implementation) explains the project-level estimate. Use that work as the input to the client comparison, rather than building a separate estimate from memory.

Test uncertainty where it affects the decision. In this example, adding £10,000 to Alder's remaining cost reduces its forecast surplus to £6,000. It does not change completed results.

If remaining costs are unknown, write “forecast unavailable”. Keep recorded costs visible so that missing information does not become a zero-cost assumption.

## Use the comparison to make a specific client decision

Keep all three views beside the proposed action. A completed result can inform future pricing, while a forecast can help you decide whether to change delivery. Neither explains the cause without further review.

For Alder, inspect the £64,000 remaining estimate before committing more capacity. Does it reflect agreed delivery? Check for extra scope or an original estimating error. A different cause needs a different response.

In a [Consulting Success interview with Will Hinde](https://www.consultingsuccess.com/building-a-consulting-model-to-stay-competitive-in-the-ai-era-with-will-hinde-podcast-386), the discussion proposes reviewing clients, projects, profitability and founder involvement together. This is practitioner context for the decision, not evidence for the example's percentages.

Korrel's client analytics use quoted project values and tracked delivery costs from active and completed project history. Their usefulness depends on the recorded rates and time, as well as expenses.

Do not interpret that quoted-value basis as accounting income or an automatic full-life forecast ranking. Prepare the remaining-cost comparison separately. Keep its date and assumptions beside the native figures.

Use the [margin and profitability guides](/blog/topics/margin-and-profitability) when you need to examine the project behind a client result. Record one named action against the cause, not against a percentage alone.

[Sign up for Korrel](https://app.korrel.ai/signup) to track quoted project values and delivery costs before your next client review.
